|
An event recorded a few hours only after the 5 new lines were powered on,
on Decembre 7th, 2007. The picture shows the optical modules that were fired
by one downgoing muon, for each of the 10 lines.
The curves show the result of the reconstruction of this muon, once
projected on each of the line used for the fit (fast reconstruction used
in the control room). The abscissa
is the time of the hit on the optical module, and the ordinate represents
the altitude (zero is the centre of the instrumented area on each line). The
colored crosses are
the hits that were used for the fit. The other crosses were not used : they
consist of random background. Click to enlarge.
|
Un événement enregistré quelques heures seulement après la mise en
opération des 5 nouvelles lignes du détecteur, le 7 décembre 2007.
L'image montre les modules
optiques qui furent touchés par le muon pour chacune des 10
lignes.
Les courbes représentent le résultat de la
reconstruction de ce muon, projeté sur chacune des lignes (reconstruction rapide
utilisée en salle de
contrôle). Les abscisses représentent le temps du coup sur le photodétecteur et les ordonnées représentent
son altitude (zéro au milieu de la zone active de chaque ligne). Les
croix colorées sont les coups utilisées pour
l'ajustement. Les autres croix sont des coups enregistrés mais pas utilisés : ils sont dus au bruit de fond aléatoire du 40K
et de la bioluminescence. Cliquez l'image pour l'avoir en plus grand.
|